Posted by Turner

The project timeline allows for each step to be listed out into major and minor steps and for each step to be assigned to one person. The steps should be listed in the advancement order. Each person assigned to a step is only responsible for completing the steps listed inside the table.


Tip: Be very detailed to avoid errors and delays due to a lack of competent work.